Goal: Simulate the administrative and planning steps required before committing to a job.
Assignment
Imagine you have received an order for a new business logo decal that is 90 cm wide for an exterior window.
- Measurements & Material: Determine if your existing stock 60 cm wide roll is sufficient. Since it is not, create a note detailing the need for the cutting by tiles workflow.
- Costing: Identify three separate costs (other than material or labor) that would apply to this specific job (e.g., transport, blade wear, design review).
- Design Review: Assume the client sent you a clean file, but you notice five small vector elements that overlap slightly. Briefly state the software action you would take to resolve these overlaps before cutting.
Submission
Submit a short written document (or bulleted list) addressing the three points above, demonstrating your pre-production planning decisions.